iPad Mini 1 - WiFi + 4G Cellular. – GRADE MOBILE®

iPad Mini 1 - WiFi + 4G Cellular.

£106.85
£106.85
30 Day Refund Guarantee

30-day refund guarantee

If you change your mind or are not happy for whatever reason, you will always have 30 days to return your item for a full refund.

Fully Unlocked Devices

Fully unlocked

All our devices are fully network unlocked to work with any SIM from all major networks.

Robotically Tested

Robotically Testing

You heard that correct. Every device is tested using cutting edge, leading industry technology and robotics. Nobody in the UK has a better testing and diagnostics procedure.

12 Month Warranty

12 month warranty

You also heard that one correct. Every single order will receive a free 12-month warranty as standard. There's also the option to extend this at checkout.

iPad Mini 1 - WiFi + 4G Cellular.

£106.85
£106.85

The very first iPad Mini. This device has been professionally refurbished and tested.

  • Colour: Black & Slate/White & Silver/Space Grey
  • Battery Specs:
    • Current: 4440 mA
    • Power: 16.5 Wh
    • Voltage: 3.72 V
  • Camera Specs:
    • Rear: 5 megapixels
  • Cellular Radio:
    • iPad2,6: Up to LTE (Bands 4, 17) (4G)
    • iPad2,7: Up to LTE (Bands 1, 3, 5, 13, 25) (4G)
  • CPU Specs:
    • Processor: S5L8942 "A5 Rev A"
    • Processor Cores: 2
    • CPU Speed: 1 GHz
  • Firmware:
  • Internal Name: iPad2,5, iPad2,6, iPad2,7
  • RAM: 512 MB
  • Storage: 16/32/64 GB

Like New


Almost perfect condition device with no signs of use when held at arms length from the eye. The device may have up to 3 blemishes such as hairline scratch. 


Renewed


A good condition device with minor signs of use from normal wear and tear. This may be a slight mark or blemish that prevents it from being put as Renewed or Pristine.


Acceptable


Standard condition device that may have minor dents and scratches to the housing and/or screen from everyday use. No cracks or heavy damage.


Heavy Wear


Used condition device that will have heavy wear and tear from everyday use to the rear case or screen from everyday use.



Battery Quality 


All devices are checked to make sure they have a battery with adequate health percentage.


The Grade refers only to the aesthetic outer appearance of the device. 

Grading does not affect functionality. All devices are fully functioning 


Every device will go through intense testing using advanced robotics and industry leading software.



USB CHARGING CABLE

A USB to lightning charging and data cable that will charge or connect to your device.

12 MONTH WARRANTY

Every single order will come with a free 12 month warranty as standard. There's also the option to extend this at the checkout to 24 or 36 months.

AFTER SALE SUPPORT

You'll also have access to our dedicated customer service team who will always be on hand to answer any questions or help with any issues you may have. Visit our FAQ page to find out how to get in touch. 

FREE, FAST and SECURE Delivery Across The UK

Your Device Will be dispatched the same day if your order is placed before 2PM 
(Monday-Friday). If you place your order past the cut off time, the order will be processed the following working day. 

All orders are dispatched with Royal Mail 24 Hour Delivery FREE of charge to all UK addresses. 

CUSTOMER SUPPORT

Monday - Friday 9:00 - 17:00
Saturday - Sunday (CLOSED)

0300 303 4949

Sales@grademobile.co.uk

30 Day Refund Guarantee

30-day refund guarantee

If you change your mind or are not happy for whatever reason, you will always have 30 days to return your item for a full refund.

Fully Unlocked Devices

Fully unlocked

All our devices are fully network unlocked to work with any SIM from all major networks.

Robotically Tested

Robotically Testing

You heard that correct. Every device is tested using cutting edge, leading industry technology and robotics. Nobody in the UK has a better testing and diagnostics procedure.

12 Month Warranty

12 month warranty

You also heard that one correct. Every single order will receive a free 12-month warranty as standard. There's also the option to extend this at checkout.

Disclaimer: Some of the devices we sell will have a new screen fitted. New screens may not be manufacturer original, nevertheless the device will receive a new LCD with True Tone fitted.

TEST

Each device has every component robotically tested following our inspection process to ensure full functionality and quality for our customers.

REFURBISH

We replace any component that is not optimal and give the device a full aesthetic clean. A fresh installation of the latest operating system is installed.

QUALITY CHECK

A final quality check is completed with an industry leading diagnostic software before being prepared for dispatch.